Seeley Breezair / Braemar Evaporative Cooler solenoid valve P/N 638638 with 1400mm long lead
Part numbers
- Seeley International part number: 638638
Seeley note: 638638 replaces 834320, 832760, 625461 and 625454 in RPC models only.
Also listed in Seeley’s 2021 price list for: Braemar RPB, Braemar RPA, Braemar RPA (industrial), Braemar RPC / RPCQ / RPCQI.
Your model number is on the compliance plate inside the cooler. Check it, or the number on your old part, before ordering.
Before you order
Check that the part number on your old part matches 638638, or that your cooler model is listed above. Not sure? Send us your cooler model and a photo of the old part and we will confirm the fit before you buy.
Related parts
See all Breezair Solenoid Valves or browse more Breezair/Braemar/Coolair parts.
Pay in instalments with Afterpay or Zip at checkout.

Irrigation
Evap. Cooler Parts
Valve Combos
WIFI Controller Combos
Fittings








Reviews
There are no reviews yet.